For all cases:
The abbreviation
for long goods
Whether for window construction or the construction of wind turbines - in both cases, long material has to be moved. With great safety and in the smallest possible area. With special driving skills and usually under time pressure. In the best case, the long goods are picked up from the side, transported and unloaded. In any case, it needs an industrial truck that meets all the requirements for user-friendliness, chassis and load securing.
Do you need a robust standard all-rounder for your long goods? Or the configured special solution for intralogistic special transports? - Genkinger manufactures transport solutions even for loads that are very long and also heavy and bulky.
- Four-way and multi-way trolley with mast feed
- Prismatic forks, pipe grabs, manipulators, troughs
up to 4.000 kg
up to 12.000 mm
